What are the construction methods for tunnel construction projects
Open cut method: suitable for shallow buried tunnels, directly excavate the ground and repair it before filling it back, like digging a ditch.
Underground excavation method: used when buried too deep to excavate the ground, including mining method (drilling and blasting) and shield tunneling method, for underground excavation construction.
Immersed tube method: mainly used for underwater tunnel construction, which involves sinking prefabricated pipe sections to the bottom of the water and splicing them together.
Drilling and blasting method: using a drilling rig to drill holes and blast open rocks, suitable for mountain hard rock tunnels, and supported by the New Austrian Method concept.
Shield tunneling method: using a large shield tunneling machine to drill in soft soil like an earthworm, while digging and installing pipe segments, suitable for urban subways.
Full section method: Explode the entire tunnel outline at once, with high efficiency but requiring hard rock.
Step method: Divide the tunnel into two layers for excavation, with the upper layer being excavated before the lower layer, which is more secure.
CD and CRD methods: Divide the large hole into small holes and excavate them separately, with a partition wall in the middle for support, suitable for weak and fractured strata.
Double side wall guide method: First, excavate the side holes on both sides for support, and then excavate the middle to control deformation effectively.
What are the structures of building construction projects
2026-05-25
What are the construction methods for tunnel construction projects
2026-04-23
What specific cost consulting content does highway cost service include
2026-03-17
Precautions for Highway Construction
2026-02-09
How to choose a reliable bidding agency service provider?
2026-01-16